Commercial Warehouse |
Installation - May/2000
Area - Saitama Prefecture Japan
Applied - Metal roof 14,000 sqft (1,300㎡)
Color - Light Blue (69-70L)
Results
In 10 years they have saved over $85,000 on energy costs
Temperature of the second floor is 27 °F (15℃) lower
Operation of the air conditioner is down to one from four
No need to water the roof in summer
Winter heating efficiency rose
Prolonged cycle for re-painting
No comments:
Post a Comment