Friday, October 17, 2014

28. Refrigerated Warehouse (MASKAR)

Qatar Friendship Fund supported a $24.3 million multifunctional fish processing plant.

Maskar
Region : Onagawa Miyagi prefecture, Japan
Gaina Applied : Roof & Outside wall
Building facing the Onagawa Bay

Received Good Design Award 2013

This well-known building is known by the slogan "Catch pikes in the fall of 2012." The town Fisheries of Onagawa were planned as a construction innovation. They included a completely refrigerated warehouse.

Designed for Tsunami protection
When a Tsunami hits the building, ALC panel of the first floor out and only pillars remain to minimize the power of the tsunami. Gaina protected the second floor which had 6000 tons of refrigerated storage capacity
2nd floor Refrigerator room











Wednesday, October 15, 2014

27. Childre's Community Center

Structural Reinforcement
Kodomo no Minna no Ie
Region : Higashimatsushima, Miyagi Prefecture Japan
Designer  Toyo Ito & Maki Onishi

Inside

Gaina Application - Exterior & Interior


Remarks
Structural reinforcement against earthquakes
 Architectural hardware sponsorship offer

Tuesday, October 14, 2014

26. Gas Holder (9°F dropped )


To suppress the temperature rise Butane Gas in the tank
Exterior Coat : 9688 ft2  (900 m2)
Color : N-95
Before

Temperature dropped 9°F (5°C) on average.

25. Chemical Tank (temperature dropped)

Chiba-shi Chiba prefecture, Japan
Bullet Tank
Control raising temperatures in chemical holding tank.
Exterior Coat : Bullet Tank 1076 ft2  (100 m2), Tank top 1776 ft2  (165 m2)
Color : N-95

Tank

Result: Levels stayed within safe perameters once coated with Gaina.
Tank Top

24. Chemical (coagulant) Tank

Shimonoseki-shi Yamaguchi prefecture, Japan
Coagulant tanks
Purpose: Control rising temperatures in coagulant storage tank in a water purification plant.

Top
Exterior Coat : 1292 ft2  (120 m2)
Color : 62-80H

23. Gas Holder

Imabari-shi in Ehime Prefecture, Japan
LP Gas Holders
To maintain a constant temperature of Liquefied Gas in the holder as much as possible.
Exterior Coat : 9042 ft2  (840 m2)
Color : 42-80D

Monday, October 13, 2014

22. University Joint Research in Tokyo Japan

Tokyo Metropolitan University
Energy Savings:
23% average throughout the year



Overview
Cost: $2 Million
Application: Roof, Outer & Inner wall
Duration: 4 years

Two identical homes were constructed. For comparison Gaina was applied to one home. The data on heating and cooling costs on both homes were collected and compared. The home with Gaina applied on it showed a significant decrease in energy costs.

Interior coating

Cooling Period (air conditioning)
   June 2nd to September 21st (112 days)
   Summer Months - 26.7% reduction

Heating Period
   October 28th to April 14th (169 days)
   Winter Months - 35.2% reduction

One must take into account the moderate temperature of the locale.
Please note, this experiment was conducted in a shaded area. If a test was conducted in a hot climate with direct sunlight, the effectiveness of the roof application would be more quantifiable.